FF&E stands for furniture, fixtures and equipment: everything movable that turns a finished building into a working hotel. Planning it early protects both the budget and the opening date. This is a practical order of work for a new property.
1. Lock the concept and room mix
Start from the brand story and the number of each room type. Quantities per room type drive every other decision, from bed sizes to how many chairs the restaurant needs.
2. Build the FF&E schedule by space
List every item by area: guest rooms, corridors, lobby, restaurant, pool, spa and back of house. For each item record dimensions, material, finish, quantity and the supplier who will quote it.
3. Specify, sample, approve
Ask for samples of key pieces and finishes before volume production. Approving a physical sample is far cheaper than correcting a full container later.
4. Set the budget with a contingency
Split the budget between guest rooms, public areas and outdoor spaces, and keep a reserve for design changes and freight. Public areas usually justify higher specifications because guests see them first.
5. Work backwards from opening day
Add production time, sea freight, customs clearance and installation, then place orders early enough to leave a buffer. Ask each supplier for a production schedule rather than a single lead-time figure.
6. Plan delivery and installation
Agree packing, labeling by room and area, storage on site and who assembles what. A clear delivery sequence stops crates piling up in the lobby.
When your schedule is ready to price, our team can respond to it through the quotation request form.
Planning a hotel, resort or villa project?
Tell us about your property and we will prepare a proposal and quotation.
Request a Quote